AURORA ENGINEERING SYSTEMSELECTRICAL ENGINEERING SYSTEMS
Contact Engineering
IF 05 · Controlled Interface

Prototyping Lab & Validation Interface

Prototype builds, rework, instrumentation, environmental test and failure analysis close the loop between design intent and physical evidence.

Prototyping Lab & Validation Interface visual
Electrical ownership

Electrical Systems Participating in this Interface

These branches provide the electrical data, constraints and verification evidence required at the interface.

Manufacturing, Test & Reliability visual
CAT 15

Manufacturing, Test & Reliability

Fabrication, SMT, inspection, ICT/JTAG, environmental test and failure analysis.

Open system →
PCB Architecture & Design visual
CAT 11

PCB Architecture & Design

Board architecture, stackups, layout, HDI, flex/rigid-flex and DFM.

Open system →
Sensors, MEMS & Instrumentation visual
CAT 09

Sensors, MEMS & Instrumentation

Inertial, pressure, optical, magnetic, thermal and chemical sensing and instrumentation.

Open system →
SI / PI / EMC / ESD visual
CAT 12

SI / PI / EMC / ESD

Transmission lines, SerDes, PDN, return paths, grounding, emissions, immunity and ESD.

Open system →
Harness / Connectors / Flex Interconnect visual
CAT 14

Harness / Connectors / Flex Interconnect

Connector selection, pinouts, cable, shielding, high-speed interconnect and EWIS.

Open system →
Packaging / Thermal / Mechanical visual
CAT 13

Packaging / Thermal / Mechanical

BGA/CSP, wafer-level packaging, interposers, thermal paths, cooling and vibration.

Open system →
Release wiring

External Division Link

The final Phase-7 root integration will connect this local interface page to the corresponding Aurora division homepage. Keeping the interface local during Phase 6 prevents broken cross-root links while the full Systems package remains isolated.

Back to Integration Hub